Saturday, 04 04th

Last updateMon, 27 Jun 2016 9am

    vi english

Map plan

Category: Bản đồ quy hoạch Published on 07 April 2014
Hits: 1485

I. SOUTH PHU YEN ECONOMIC ZONE

South Phu Yen Economic Zone (EZ) is the general economic region, important dynamic Zone of south - central coastal region. It is also the traffic gateway clue on roads, waterways, aviation of the South Central Coast, the Highlands to the Southern provinces of Laos, Northeastern Cambodia and Thailand. It is also a transitional space between the central key economic region and the southern key economic region of the South. Phu Yen Economic Zone is one of 15 coastal economic zones of the country.

It has an area of ​​20 730 ha located in Tuy Hoa City and Dong Hoa District, Phu Yen Province, stretching from the south of Da Rang River to Vung Ro Port, the East Sea on the east, the West to the highway corridor of North-South Expressway, the South to Van Ninh District in Khanh Hoa province, the North to Da Rang River. The South Phu Yen Economic Zone is located in the very favorable exchange links, direct integration with regional economic development areas in the country and internationally.

qhsmall

1. 1. Hi-Tech zone is in South Phu Yen economic zone and approved by leaders of the provinxe for the detailed construction planning, ratio 1/2,000 (Decision No 1834/QDD-UBND dated 16 OCtober 2013 of Chairman of Phu Yen People's Committee).

Land used area: 251,6ha in North of Hoa Hiep commune (Dong Hoa district)

QH-04---Su-dung-dat-khu-CN-Caoo

1.2. The South Tuy Hoa Urban is located in the planning map of the EZ, belonging to Phu Dong area of which the south is next to Ngo Gia Tu Str., North to Da Rang river, the seaa to the East, and 1A high way to the west (former).

Land used area: 394,06ha.

KIẾN-TRÚC-CẢNH-QUAN-ĐÔ-THỊ-NAM-TUY-HÒAA

II. INDUSTRIAL ZONES

2.1. Hoa Hiep Industrial zone - Phase 1: Year of establishment of IP: Decision No. 804/QĐ-BXD dated July 13, 1999.

Total erae: 101,5ha;

HOA-HIEP-1-Model-copyyy

2.1. An Phu Industrial Zone is approved by leaders of the provinxe for the detailed construction planning, (Decision No 1581/QD-UBND dated 25 August 2009 of Chairman of Phu Yen People's Committee).

Geographical location: Located An Phu commune, Tuy Hoa City. It is 100m from Highway 1A, 4km  from Tuy Hoa railway station, 30km from Vung Ro port, main internal roads: 40m in width with 2 lanes; branch roads: 16 meters in width.

Total erae: 68,4 ha;

ANPHU-Model-copyyy

2.3. Song Cau North-East Industrial Zone - Phase 1 is approved by leaders of the provinxe for the detailed construction planning, (Decision No 1300/QD-UBND dated 20 August 2008 of Chairman of Phu Yen People's Committee).

Geographical location: Located Xuan Hai and Xuan Hoa commune, Song Cau district Tuy Hoa City. It is 60km from Tuy Hoa city, 20km from Quy Nhon port, located on Highway 1D (Song Cau to Quy Nhon)

Total erae: 105,8 ha

SONG-CAU-1-Model-copyyyyy

2.4. Song Cau North-East Industrial Zone - Phase 2 is approved by leaders of the provinxe for the detailed construction planning, (Decision No 1465/QD-UBND dated 06 October 2010 of Chairman of Phu Yen People's Committee).

Geographical location: Located Xuan Hai and Xuan Hoa commune, Song Cau district Tuy Hoa City. It is 60km from Tuy Hoa city, 20km from Quy Nhon port, located on Highway 1D (Song Cau to Quy Nhon)

Total erae: 81,802 ha;

04- SU DUNG ĐAT DBSC 2

III. RESIDENTIAL SERVICE INDUSTRIAL ZONE

3.1. Master Plan detailing construction residential service Hoa Hiep industrial zone is approved by leaders of the provinxe for the detailed construction planning, (Decision No 114/QDD-UBND dated 08 January 2001 of Chairman of Phu Yen People's Committee).

Boundary:

- East:  640m far from east coast.

- West:district roads, from Phu Lam to Hòa Hiệp wide 20m.

- South: existing asphalt wide 16m.

- North: 160m far from Hoa Hiep industrial zone.

Area: 131ha, located Hoa Hiep Trung and Hoa Hiep Nam commune, Dong Hoa district. It is 20km  far from Tuy Hoa, 8km far from Highway 1A, about 10km far from Vung Ro port, 120km far from Quy Nhon port, and 5km far from Tuy Hoa Airport.

SDĐ KHU DC PHUC VỤ KCN HHHHH

3.2. Residential service Song Cau North-East industrial zone is approved by leaders of the provinxe for the detailed construction planning, (Decision No 1709/QD-UBND dated 01 July 2004 of Chairman of Phu Yen People's Committee).

Boundary:

- East: Old project JICA. It is 900m far from Highway 1D about the East.

- West: Highway 1D (Quy Nhon - Song Cau route).

- South: inter-village roads from Hoa Phu - Hoa An (R=25m).

- North: M1M2 way mark of the Song Cau North-East industrial zone.

Area: 140 ha, located Xuan Hoa commune, Song Cau district.

SDD -  KHU DC PHUC VỤ KCN ĐBSCCCC

3.3. Group Residential Housing South-West is approved by leaders of the provinxe for the detailed construction planning, ratio 1/500 (Decision No 389/QD-UBND dated 16 March 2012 of Chairman of Phu Yen People's Committee).

Boundary:

- East: KDC planned internal road.

- West: KDC planned internal road.

- South: communal roads to Bai Nom.

- North: KDC planned internal road.

Investor: Phu Yen Economic Zone Authority.

Area:  8,40 ha, located in the plot CC18, LX1, LX2, CC27 and CC28 (according to the project for construction plan details, rate 1/2000, is approved by Decision No 1709 /  dated 01 July 2004 (Residential service Song Cau North-East Industrial Zone).

Project objectives:As the existing residential neighborhood, the urbanization in the direction of one of the planned housing areas (in units of residential area south-west of the residential service Song Cau North-East industrial zone ); having infrastructure facilities sync.

07--kien-truc-canh-quaN-khu-nha-o-Tay-Nam

resources&environment

count visitors

00381639
Today
Yesterday
All
105
167
381639
You are here: Home Map Master plan